f
TAGS
H

Group Charter Rides

WE CAN PROVIDE SUPPORT FOR SMALL GROUPS 

SE QLD MOUNTAIN COUNTRY 9 DAYS


IPSWICH LOOP VIA BRISBANE VALLEY RAIL TRAIL, BUNYA MTNS, DARLING DOWNS, CLIFTON, WARWICK, CONDAMINE RIVER ROAD / WATERFALLS WAY & BOONAH.

ONE VEHICLE SUPPORT SUITS APRIL TO SEPTEMBER 

Ride Ipswich to Ipswich on this spectacular 600km rail trails and sealed back roads circuit ride. No bus transfers needed!
We ran this in 2015 - even better now with Brisbane Valley Rail Trail complete.
IPSWICH LOOP VIA BRISBANE VALLEY RAIL TRAIL, BUNYA MTNS, DARLING DOWNS, CLIFTON, WARWICK, CONDAMINE RIVER ROAD / WATERFALLS WAY & BOONAH.ONE VEHICLE SUPPORTSUITS APRIL TO SEPTEMBER 

Ride Ipswich to Ipswich on this spectacular 600km rail trails and sealed back roads circuit ride. No bus transfers needed!
We ran this in 2015 - even better now with Brisbane Valley Rail Trail complete.
BUNDABERG TO TAMWORTH 930KM 15 DAYS
Back roads, mostly sealed, with overnights at Gin Gin, Mt Perry, Gayndah, Mundubarra, Boondoomah Homestead, Jandowae, Dalby, Milmerran, Inglewood, Texas, Ashford, Inverell, Bundarra and Bendemeer. All days between 40 and 90 kms. 
Camping with options to upgrade.
Transfers can be offered Noosa/Gympie to Bundaberg and from Tamworth to Sydney. 
BUNDABERG TO IPSWICH RIDE 11 DAYS
VIA BURNETT REGION & BRISBANE VALLEY RAIL TRAIL
ONE
VEHICLE SUPPORT
SUITS APRIL TO SEPTEMBER 

Ride Bundaberg to Murgon and on to Ipswich on this 620km sealed back roads and rail trails ride. Follows proposed Bundaberg to Mt Perry Rail Trail, Boolboondah Tunnel Rail Trail, Gayndah Heritage Railway Rail Trail, proposed Proston Rail Trail, Murgon to Kingaroy on the South Burnett Rail Trail - and entire Brisbane Valley Rail Trail.Well over 200km is on established rail trails.Sunshine Coast, Gympie, Maryborough and Hervey Bay residents, this is all within 250km radius.Brisbane residents are OK to join Stage 2.Bundy residents are OK to join Stage 1.Stage 1 Bundaberg to Murgon 370km in 6 days Satge 2 Murgon to Ipswich 250km in 5 days 

IPSWICH TO NOOSA 310KM 7 DAYS

Ride Queensland's two long-distance rail trails, the Brisbane Valley and South Burnett. Transfers on our bus from end of SBRT to Nambour or Noosa.

Overnights in Lowood, Toogooloowah, Blackbutt, Nanango, Wondai and Goomeri.Camping with options to upgrade.

NOOSA RIDES 5-7 DAYS

Combine a resort-stay in 4-star apartments with 3 or 4 days of rides, taking back roads and trails with  transfers on our bus to give extended possibilities.